Most of our wood flooring is produced with our revolutionary glueless Woodloc® or Woodloc® 5S joint, which locks the boards together mechanically, with virtually invisible joints. The superior fit also enhances the floor's performance and durability.

Instruction film for installing Kährs wood flooring with Woodloc® 5S joint

 

Floor installaton checklist:

  • A floor can only be as good as the subfloor permits.
  • To avoid moisture absorption, open the packages only when needed during installation.
  • When installing, the temperature of the materials, subfloor and on site must be at least 18 °C.
  • The relative humidity on site must be below 60%.
  • The subfloor must be dry, clean, solid and sufficiently flat.
  • Soft, elastic subfloors must be adjusted.
  • Make sure that the correct vapour barrier is fitted.
  • The foam plastic underlay (EPS) must have sufficient compressive strength.
  • The foam plastic film must comply with applicable thickness tolerances.
  • Put aside any damaged or faulty floorboards.

 

For more detailed information regarding installation methods and sub-floor requirements, download the installation PDF for each product:

Installation Guide - Woodloc® 5S
Advice for installing Woodloc® 5S
Installation Guide - Woodloc®
Installation Guide - Chevron Collection
Installation Guide - Tongue & Groove glue down
Installation instructions - two layer
Installation instructions - Activity Floor-Woodloc® 5S
Subfloor Requirements & Underfloor Heating